The site manager

A daily diary from your site photos, and a RAMS pack drafted from the same evidence.

Ewa runs a housing site. The diary has to exist every day, and the RAMS pack has to match what's actually on site.

How it works

  1. Walk the site at breakfast. Photos in, three spoken lines per area.
  2. The day's diary drafts itself, dated and sectioned.
  3. When the method changes, re-photograph and draft the RAMS pack from the same evidence.

Report types used: Site daily diary · RAMS from site photos.

Site diary
RAMS pack

What the document looks like

Job completion & handover report Sample

Fictional demonstration content — every real report is drafted from the job's own evidence and reviewed by its author.

Summary

Bathroom refurbishment completed at 14 Marlow Road on 12 October 2026. All agreed work finished and checked. Two outstanding items listed below with reasons and dates.

Work completed

Isolation valve replaced on the basin supply; pipework re-supported and pressure tested at 3 bar for 30 minutes — no leaks. Tiling made good to the channel recess; silicone toolled and curing.

Evidence (14 photos)

All 14 photos attached and printed in this document. Photos 6–9 show the pressure test readings at start and end.

Outstanding items

1) Towel-rail delivery expected 16 October — fit booked 17 October, 8:00. 2) Grout seal recommended after 72 hours; customer advised in person.